Creating Views

Creating Views

  • Duplicate each floor plan view 6 times as dependent views. Then rename those views as per this naming convention: {View Name}-mech-Zone-{seq}, in which seq is a number that starts from 1 and increases by 1 as new views are created.
  • Now find all the scope boxes in the model and apply the relevant scope box to each of those views. For example, apply the scope box called Zone 1 to the view that ends in Zone-1 and scope box called Zone 2 on view ending Zone-2 and so on.
  • Now for each of those views create a sheet and put each view on a sheet. The sheet numbers to follow this convention: RME-{seq}. In which the "seq" is a number that starts from 1 to the number of the views






    • Related Articles

    • Creating gridlines

      Create 6 horizontal and 6 vertical gridlines on this view. The distance between gridlines to be 8m apart from each other. The horizontal grid lines to be named alphabetically and start from A. Vertical gridlines to be numerical and start from 1
    • Creating Shaft Openings

      For each selected column create a shaft opening. Make the shaft size the same as columns sizes and place them at the same height as base level of the columns. The top constraint to be the top of the column.